Tolt River Bridge

Specifications

A new bridge structure ( a 600' dual camel back bridge design) similar to the historic structure that the new bridge replaced over the Tolt River. Full containment of all field preparation and painting activities was required. Pressure wash all new structural steel and field preparation of field assembly points. 2 coats of Moisture cure urethane coating system as a field finishes after erection. Coating System was supplied by Sherwin Williams.

Project Location: Washington
Type: Marine Industrial Coatings & Linings
Client Name: King County Department of Transportation