St. John's Bridge

Specifications

Project Location: Portland, OR
Project Date: 2003 - 2005
Client Name: Max J. Kuney
Overview:  The repainting of this large suspension bridge in Portland was done in conjunction with the replacement of the concrete bridge deck. Existing lead-based paint was removed by abrasive blasting and vacuum-powered hand tools. Blasting and repainting was done inside Class 1 Containment.