Golden Gate Bridge - Southern Approach
Specifications
| Project Location: CA Type: Industrial Coatings and Linings Project Date: 2003 - 2005 Client Name: Shimmick / Obayashi |
Overview: This seismic retrofit project is designed to strengthen the roadway and bridge deck on the San Francisco side of the Golden Gate. Working from a flexible deck system, Long's crews removed the existing lead-based paint from selected sections of the bridge substructure and then repainted them. Abrasive blasting was done inside Class 1 containment structures. A moisture cure urethane from Wasser was used. |